• open panel

Renovation of 6 East

VA Medical Center, Oklahoma, OK

 

Scope: BES Design/Build, LLC (BES D/B) was awarded to renovate approximately 6,000 SF on the 6th Floor at the Oklahoma VAMC, OK. The renovation of this space consists of 18 patient rooms (2 of which are isolation rooms with ante rooms), team room, nourishment room, pharmacy medication room, clean linen room, clean supply room, clean utility room, housekeeping closet, telecom closet. electrical room, signal closet, soiled utility room, trash room, 2 gas storage rooms, equipment storage room, nurse managers office, assistant nurse manager’s office, staff bathroom and locker rooms, nurse call, pneumatic tube station, fire alarm system, CCTV, etc. The scope includes selective demotion, interior construction, interior finishes, plumbing, HVAC, fire protection, electrical systems, nurse call systems, equipment, furnishings, nurse stations, communications, security systems, TV, and CCTV.

Cost: $2,340,000

Client: U.S. Department of Veterans Affairs

 

 

© 2011 BES Design/Build, LLC
Powered By DynamiX