• open panel

Arc Flash Analysis

Fort Worth, TX 

 

Scope: BES Design/Build, LLC (BES D/B) was awarded a contract to perform arc flash analysis for the Western Currency Facility (WCF). The analysis will include determining the degree of arc flash that is present throughout the electrical distribution system, identifying the appropriate personnel protective equipment required, and making recommendations to reduce the hazard risk category.

Cost: $112,510

Client: Bureau of Engraving and Printing Office of Acquisition

© 2011 BES Design/Build, LLC
Powered By DynamiX